A1A Lap Phase – FDOT QC Testing

This two phase project included underground utilities, pedestrian and bicycle lanes, new sidewalks, and road widening along the .75 mile roadway. Phase 2 of this project was part of the LAP program. 

GFA Role
  • GFA maintained an FDOT density log book on site.
  • GFA provided construction materials testing for modified proctors, LBR’s, field density tests for pipe backfill, subgrade, and base material. 
  • GFA also performed concrete testing and air content testing on sidewalks and curbs, and performed asphalt cores to determine thickness and to run bitumen content tests on the new roadway.
GFA Contract
  • $6,524.00