Abacoa Community Park Phase II

This project consisted of the construction of 4 athletic fields, a 5,000 square foot one-story building, parking lot, and modifications to the existing skate park. 

GFA Role
  • GFA conducted a geotechnical study with SPT borings, laboratory permeability’s, grain size analysis, organic content for the design of the parking lot, building and athletic fields.
  • During construction, GFA performed modified proctors, LBR’s, field density tests for the playing fields, building, and parking areas. GFA also performed 4″ concrete cores on the existing skate park to assist in the design of the new ramps. 
  • GFA performed asphalt cores in the parking areas to determine thickness and to run bitumen content testing