City of Cape Coral Bio-Solids Centrifuge Installation

This project consisted of the installation of three new centrifuge units and a 15-ton traveling bridge crane within the sludge processing building. 

GFA Services
  • GFA provided a geotechnical exploration consisting of two standard penetration test borings to depths of 40-feet below existing grade. One boring was performed on the exterior of the building and one was performed on the inside of the sludge processing building.