Flood Control and Coastal Emergency Beach Erosion Control Segment II

This project consisted of the renourishment of 5.1 miles of critically eroded shoreline immediately south of Hillsboro Inlet, between Florida Department of Environmental Protection Range Monuments R-26 to R-53.X. The project duration was 152 days. 

GFA Services
  • GFA performed a pre-construction structural survey and a post-construction structural survey, inspecting existing structures within 200 feet from the beach fill limit. 
  • GFA developed a vibration control plan, monitored ground vibrations with a remote seismograph system, provided a qualified vibration control specialist who submitted biweekly reports of all results to the QC Manager. 
  • GFA provided sound survey services of equipment used for the project. 
  • GFA developed a quality control plan and provided construction materials testing services, which included laboratory testing of sieve analysis, material finer than 200/230, carbonate testing, munsell soil color, organic content, and free shell content.