Holy Cross Hospital Hybrid OR Addition

This project consisted of the addition of a three-story, 22,000-square foot operating room with computerized surgical equipment and a mechanical penthouse. The structure is a concrete frame with precast concrete and is supported by auger cast concrete piles. Estimated total cost of construction is $8 million. 

GFA Services
  • GFA performed a geotechnical exploration consisting of three standard penetration test borings to a depth of 50 feet below grade.
  • GFA provided an engineering field technician to perform pile installation monitoring. During pile installation, the engineering field technician collected samples of pile grout for compressive strength testing. 
  • GFA provided certified field technicians and a certified laboratory to complete construction materials testing for all soils and concrete material used for the project.