Jupiter Medical Center Mastroianni Family Pediatric Emergency Department & Observation Unit Expansion

The Mastroianni Family Pediatric Emergency Department Expansion project consists of the addition of a one-story observation unit, a one-story emergency department addition, and a two-story intensive care unit. 

GFA Services
  • GFA provided a geotechnical exploration consisting of four standard penetration test (SPT) borings to depths of 20-feet below existing grade and one standard penetration test (SPT) boring to a depth of 65-feet below existing grade. 
  • GFA is providing engineering field technicians and a certified laboratory to perform construction materials testing services for all soil, aggregate, and concrete materials used for the project. 
  • GFA is provided licensed inspectors to perform threshold inspections for all reinforcing steel placements, shoring and re-shoring inspection verification, concrete and grout placement monitoring, pre and post fill cell grouting, and structural steel connections.