Marriott – Pompano Beach

This project consisted of selective demolition and interior renovation of an existing lobby, restaurant, kitchen, guestrooms, and corridors in an existing nine-story building and new
construction of an eight-story, 119 room hotel on a parking garage base and connector building which includes a ballroom, meeting rooms, and an upper deck event lawn.

GFA Services
  • GFA performed a geotechnical exploration consisting of 4 standard penetration test borings to depths of 75-feet below existing grade and two exfiltration tests to depths of 10-feet below existing grade. 
  • GFA provided engineering field technicians to perform pile installation monitoring services, which included taking samples of pile grout for laboratory compressive strength testing. 
  • GFA provided engineering field technicians and a certified laboratory to perform construction materials testing services for all soils and concrete material used for the project. 
  • GFA provided licensed inspectors to perform post tensioned cable elongation monitoring services and threshold inspections for reinforcing steel placements, shoring and re-shoring inspection verification, concrete and grout placement monitoring, pre and post fill cell grouting, and structural steel inspections. 
  • GFA provided a Licensed Asbestos Consultant to perform a Limited Asbestos Containing Materials Building Survey and Point County Method Analysis of Popcorn Texturing.