North 25th Street (State Road 615) Resurfacing Project

This project consisted of the milling and resurfacing of N. 25th Street / SR 615, constructing new sidewalk on both sides of road from where existing sidewalk ends to U.S. 1, constructing 6-foot buffered bike lanes in each direction, rebuilding handicap ramps throughout project limits at qualifying locations, upgrading signs and pavement marking, and upgrading pedestrian signal control buttons and adding countdown timers at the St. Lucie Boulevard / N. 25th Street and U.S. 1 / N. 25th Street intersections. Estimated total cost of construction is $2,142,842.36. 

GFA Services
  • GFA provided certified engineering field technicians and a certified laboratory to perform construction materials testing for all soils and concrete materials used for the project.