Old Boynton Beach High School

This project consists of renovations to the Historic Boynton Beach High School. The 28,402-square foot building will serve as a recreation and civic center and will house a 500-seat auditorium. It will also have 500 square feet of restaurant space and people will be able to rent space for private functions. 

GFA Services
  • GFA performed a Limited Asbestos Containing Materials Building Survey which consisted of collecting a total of twenty-six bulk samples from eleven homogeneous areas of suspect asbestos-containing materials for laboratory analysis. 
  • GFA performed a Lead Based Paint Survey to identify lead content in paint in general accordance with the HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing. This included utilizing a portable x-ray fluorescence analyzer and collecting paint chip samples for laboratory analysis. 
  • GFA provided observation and documentation reporting services during lead paint and asbestos removal procedures. This included air sample collections, construction debris waste stream testing activities, and laboratory analytical reports received during this time period.