Phase I Bolles East (L-16) Canal Conveyance Improvement Project

This project includes, but is not limited to, the deepening and widening of a portion of the existing L-16 Bolles East Canal in order to increase the conveyance capacity. The length of segment 3 is approximately 3.3 miles. In addition, the work includes constructing farm ditches and an access road along the length of the newly excavated canal. 

GFA Services
  • GFA provided Pre-Construction Structural Survey services, inspecting existing structures within 500 feet from the work limit. Immediately after completion of work, GFA will conduct a Post-Construction Inspection of the structures previously inspected. 
  • GFA is providing Quality Control Testing and Management services. This includes conducting all laboratory testing at our accredited laboratory, providing equipment and qualified technicians to sample, aggregate and soil samples, and providing a Quality Control Manager to supervise and coordinate all laboratory and field testing performed by GFA personnel.
  • GFA is providing Vibration Monitoring Services which includes developing a Vibration Control Plan, monitoring ground vibration levels with a seismograph utilizing a remote monitoring system, providing a qualified Vibration Control Specialist, and submitting bi-weekly and monthly reports to the QC Manager for transmittal to the ACOE. 
  • GFA is providing Turbidity Monitoring services.