Sarasota Airport Control Tower

This project consisted of the new construction of a control tower at the Sarasota-Bradenton International Airport. The tower’s foundation consists of 70 auger cast-in-place pile foundations. 

GFA Services
  • GFA provided geotechnical engineering services consisting of auger cast-in-place pile installation monitoring. This included an engineering field technician on site during pile installation to monitor the activity, the collection of pile grout samples for compressive strength testing in our laboratory and providing a production pile completion report.