Sarno Road – U.S. Highway 1

This project consists of the addition of a right hand turn lane for eastbound Sarno Road trafic, a stormwater pond, and signalization. This includes replacing the intersection’s wire-span traffic signals with steel mast-arm structures, adding three pedestrian curb ramps, and installing new sidewalk connections and crosswalk striping. Estimated total construction cost is $520,994.

GFA Services
  • GFA International is providing certified engineering field technicians and a certified laboratory to perform construction materials testing for all soils and concrete material used for the project.