Somerset Academy and College Preparatory School

The Somerset Academy project was a two-story, 40,000-square foot building located on a 10-acre site. This project also included a new parking lot and underground utilities.

GFA Services
  • GFA provided quality control management for the testing of the parking areas, building footprint, and testing of the concrete for vertical construction. This included density testing, proctors, LBRs, concrete cylinder collection, and concrete cylinder breaks for compressive strength results.
  • GFA provided licensed and certified inspectors to perform threshold inspections on all reinforcing steel placements, shoring and re-shoring inspection verification, concrete and grout placement monitoring, pre and post fill cell grouting, and structural steel inspections.