SR 614 (Indrio Road)

The SR 614 (Indrio Road) Widening Project consists of widening on Indrio Road from West of the I-95 interchange to East of Emerson Avenue. This 2.7 mile project began in May of 2016 and is anticipated to be completed by Spring 2019. The project includes reconstructing the existing two-lane Indrio Road to a four-lane, divided highway with a raised median, constructing a 6-foot sidewalk along the south side and a 12-foot wide multi-purpose trail along the north side of Indrio Road, realigning Spanish Lakes Boulevard to connect with Kobelgard Road, reconstructing Koblegard Road from Indrio Road north approximately .5 mile, and installing new highway lighting, signage, and signalization. 

GFA Services
  • FDOT Earthwork Level 1 and 2 Technicians
  • FDOT Concrete Level 1 Inspectors
  • Geotechnical Drilled Shaft Technicians
  • Quality Control Plan with density log book creation and maintenance
  • LIMS data entry
GFA Contract
  • $230,945.00