This project consisted of the renourishment of eroded shoreline on Sunny Isles Beach in Sunny Isles, Florida. Approximately 36,000 cubic yards of beach sand was placed from The Golden Strand to the Sands Point Condominium. The project took approximately sixty days to complete.

GFA Services
  • GFA completed pre and post construction surveys, created and managed a vibration quality control plan and performed vibration monitoring
  • GFA also performed soils testing and turbidity monitoring
GFA Contract
  • $27,410.00