Sweetwater Pump Stations Phase IIB

This project consisted of the new construction of two pump stations and a 36-inch force main pipe in the City of Sweetwater, Florida. 

GFA Services
  • GFA performed a Geotechnical Exploration consisting of two standard penetration test (SPT) borings to depths of 25-feet below existing grade and four standard penetration test borings to depths of 15-feet below existing grade.