The Mark

This project consists of the new construction of a mixed use, 12-story structure. The structure will have 157 residences and a secured residential parking garage, as well as 11,000-square feet of executive office suites. 

GFA Services
  • GFA performed a Geotechnical Exploration which consisted of three standard penetration test (SPT) borings to a depth of 60 feet below existing grade within the proposed footprint of the building and one standard penetration test (SPT) boring to a depth of 60 feet below existing grade within the proposed footprint of the FP&L Vault that will support the building. 
  • GFA is providing an engineering field technician to perform auger cast-in-place pile installation monitoring and load testing monitoring. This includes obtaining samples of pile grout for compressive strength testing in our laboratory. 
  • GFA performed a pre-construction structure condition survey on the exterior of existing buildings located adjacent to the project site to memorialize damage and/or deterioration prior to the planned construction activities.
  • GFA is providing engineering field technicians and a laboratory to perform construction materials testing for all soils and concrete materials used for the project