Tippen Bay

The project consisted of the design for a future wetlands restoration project of agricultural lands to wetlands. The project consisted of design of levees and water control structures associated with the wetland restoration project. 

GFA Services
  • GFA performed a geotechnical exploration consisting of five standard penetration test (SPT) borings to depths of 15-feet below existing grade.
  • GFA provided construction materials testing services consisting of gradation with #200 wash, atterberg limits testing, and organic content testing for soil samples taken from each boring.