Northbridge Centre Renovation

This project consisted of renovations inside an existing high rise building located in West Palm Beach, Florida. The areas marked for renovation included corridors, bathrooms, elevator lobbies, and elevator cabs on floors 2, 3, 7, 8, 9, 11, 12, 14, 17, and 21; the entire second floor including an existing deli; main atrium lobby; and elevator lobbies in the parking deck under the building. 

GFA Services
  • GFA provided a Certified Asbestos Building inspector to complete a physical inspection of the building where the proposed renovations were located. The inspector collected approximately seventy bulk samples for laboratory analysis for asbestos content via polarized light microscopy.