This project consists of the new construction of a 4-story, 15-unit, multi-family residential apartment building. The amenities include a landscaped courtyard, private gym, and a pool area, as well as a dock along the New River for boats. 

GFA Services
  • GFA performed a Pre-Construction Video Survey of surrounding properties prior to the commencement of construction. GFA will complete a Post-Construction Video Survey when construction is completed.
  • GFA performed a Geotechnical Exploration consisting of five standard penetration test borings to depths of 60-feet below existing grade and two exfiltration tests to depths of 10-feet below existing grade. 
  • GFA performed a Phase I Environmental Site Assessment with an Environmental Lien Search. This consisted of four components: records review, site reconnaissance, interviews, and preparation of the Phase I ESA report. 
  • GFA is providing engineering technicians to oversee the Vibro-Replacement activities. GFA is performing confirmation test borings at each vibro-point. 
  • GFA is providing engineering field technicians and a certified laboratory to complete Construction Materials Testing services for all soils and concrete materials utilized for the project construction. 
  • GFA is providing licensed inspectors to perform Threshold and Special Inspections for reinforcing steel placement, shoring and re-shoring inspection verification, concrete and grout placement monitoring, pre and post fill cell grouting, structural steel, exterior windows and doors, precast concrete units, engineered unit masonry, weld connections, and bolt connections.