North Port Weir Structure No. 115
This project consisted of the new construction of a weir replacement structure for the North Port Waterway at the subject site.
GFA Services
- GFA provided a geotechnical exploration consisting of two standard penetration test (SPT) borings to depths of 50-feet below existing grade and two permeability tests.