Wallace Self Storage

This project consists of the new construction of a storage facility with two buildings and 63,173-square feet total. Building A is a single-story structure and Building B is a two story structure. 

GFA Services
  • GFA performed a Phase I Environmental Site Assessment with an Environmental Lien Search. This consisted of four components: records review, site reconnaissance, interviews, and preparation of the Phase I ESA Report.
  • GFA performed a Geotechnical Exploration consisting of five standard penetration test borings to depths of 15-feet below existing grade and three exfiltration tests to depths of 10-feet below existing grade. 
  • GFA provided an engineering field technician to perform soils replacement monitoring. 
  • GFA is providing engineering field technicians and a certified laboratory to complete Construction Materials Testing services for all soils and concrete material used for the project. 
  • GFA is providing licensed inspectors to perform Special Inspections on structural components as required by the City of Delray Beach.  This includes precast concrete units, engineered unit masonry, and weld and bold connections.